We are pleased to inform you that the following works such as, Tile bed laying for residential floors, Data and intercom wiring, Ceiling works on residential floors and pantry area, Ceiling putty work on the 11th residential floor, Remaining electrical wiring at the gym and car park, Tile bed laying and final waterproofing for balconies and bathrooms, Tile bed laying for the car park staircase are progressing smoothly at our luxury oceanfront condo project located at No. 06, 19th Lane, Colombo 03