Enter your email address below and subscribe to our newsletter

Works are progressing consistently at – No.06, 19th Lane, Colombo 03

Share your love

We are pleased to inform you that the following works are progressing consistently at our 19th Lane site: tile bed laying on the 7th residential floor, aluminum work in the lobby area of the 7th residential floor, waterproofing of balconies on the 7th residential floor, tile bed laying on the 4th residential floor, aluminum work in the gym area, and chip concreting of the staircase from Car Park Level 04 to Level 03.

Leave a Reply

Your email address will not be published. Required fields are marked *